A bespoke ring normally takes 2-4 weeks from approved design, not from the first conversation. Design adds a few days on top: renders arrive within 24 hours of an agreed brief and revisions are usually same-day. Where a date cannot move, express handling compresses the build to 4-6 days — but stone sourcing and assay slots are the parts that resist compression.
| Stage | What happens | Typical duration |
|---|---|---|
| Consultation | Brief, budget, stone selection, finger size | 1 hour, by appointment |
| CAD and renders | Model built, photorealistic renders issued | Within 24 hours of an agreed brief |
| Revisions and approval | Changes logged, design signed off in writing | Same working day per revision |
| Model and casting | Wax printed, invested, cast in your metal | A few working days, queued against your date |
| Setting and finishing | Seats cut to the stone, stones set, polished | Longer with high stone counts |
| Assay and hallmarking | Pieces tested and marked at a UK assay office | A few working days |
| Delivery | Final check, insured delivery or collection | 1-2 days |
What happens at the first consultation?
You spend an hour at 100 Hatton Garden, Suite 225, with someone who actually makes the pieces. Bring a photograph, a sketch, an inherited stone or nothing at all. You will see real stones rather than a screen, compare them under the loupe, and leave with a clear view of what your budget buys and a written quote.
Appointments exist for a reason: a rushed brief produces a design the workshop then has to re-do. If you cannot visit, the whole process works remotely by sharing renders, certificates and production photographs.
Where does the time actually go?
Not into the bench work. Setting a ring takes hours, not weeks — the calendar time is queueing and stone sourcing. That is why we book a casting slot against your date at the start of a job rather than at the end, and why the express service works at all: it reorders the queue.
Two things genuinely cannot be rushed. Sourcing a specific stone to a specific specification can take days, and a UK assay office slot is a fixed process. Neither is negotiable, and we will say so at the first meeting rather than pretend otherwise.
Can a bespoke ring be made in a week?
Sometimes. Our express service compresses a build to 4-6 days where the design is settled and the stone is in hand or already chosen. What it cannot absorb is an unsettled design, a stone that has to be sourced to spec, or a high stone count of pavé work.
If your proposal date is fixed, tell us at the first conversation. We would rather give you a hard no in week one than a missed date in week four.
How do I keep the project on schedule?
Approve the render promptly, and tell us about deadlines once. Every design approval and revision is logged against your project record, so the workshop works from one approved version and nothing is rebuilt because two people remembered the brief differently.
If you are commissioning for a date, work backwards from delivery rather than from the first appointment. A ring needed for the 20th needs its design approved by the 1st, not the 18th.
Stage-by-stage day counts
Measured from the first conversation to delivery, most commissions run 3-6 weeks, with 4-6 weeks as the standard band and 8 or more weeks for intricate work. The workshop build itself is 2-4 weeks from approved CAD; the extra elapsed time is consultation, stone sourcing and assay, which sit either side of the making.
The stages run in this order. Consultation and brief: day 0. First CAD render: within 24 hours of an agreed brief. Approval and revisions: 1-3 days, depending on how many changes are needed. Stone sourcing: variable, because it depends on the specification. Casting: 2-5 days. Setting: 2-5 working days. Finishing: 1-3 days. Assay and hallmarking: 3-5 working days. Delivery: 1-2 days by insured courier.
Two things stretch the total. An intricate design, particularly one with a lot of pavé or an invisible setting, takes longer at the bench. And a stone sourced to a tight specification can take longer to find than the making takes to complete. Where a date cannot move, express compresses the build to 4-6 days, and we will say at the first meeting whether the design and the stone make that realistic.
Questions about this
How long does a bespoke engagement ring take?
Standard is 2-4 weeks from approved design, with renders within 24 hours of the brief. Express is 4-6 days where the design is settled and the stone is available.
Can I speed up the CAD stage?
The CAD stage is already fast — first renders within 24 hours and revisions usually the same day. The time is in metal work and stone sourcing.
What if I miss my deadline?
Tell us as early as possible. If the build has not started, dates can usually be re-sequenced; if it is mid-production, we will tell you what is genuinely achievable.
Where this happens
Both routes are the same workshop at 100 Hatton Garden, Suite 225, London EC1N 8NX.
Our bespoke jewellery manufacturing process