Caesar Diamonds
How Caesar Track Works, Stage by Stage
Caesar Track records a commission as a sequence of stages rather than a single status. Each stage carries its own evidence: the brief and the quote, the approved render, the casting record, the setting check, the finishing note, the assay hallmark, and the dispatch details. Anyone looking at the project can see what has been done and what was agreed.
Stage one: the brief and the quote
The record opens with what you asked for. The brief, any reference images, the metal and stone specification, the budget range and the deadline are written down before a price is discussed, because a quote built on a remembered conversation is a quote that will be argued about.
The costed plan is attached to the same record. It separates the metal, the stones and the making, so a later change to any one of them is priced against the original rather than renegotiated from nothing.
Stage two: CAD and render approval
The CAD model and the renders made from it are attached, with the version you approved marked. Renders arrive within 24 hours of an agreed brief, and revisions continue until the design and proportions are right.
The approved version is the one that goes to casting. That matters if a question arises later, and it matters more on a repeat order, because the model that was signed off is the model that gets made.
Stage three: casting
The casting record covers the metal issued to the job, the weight, and the inspection of the casting before it reaches a setter. Porosity and shrinkage are checked at this point rather than after the stones are in, because a casting fault found late is expensive to correct.
Where a job repeats a stored specification, the master model is used rather than a new one, and the batch is checked against that specification rather than against the previous batch.
Stage four: setting
Setting is recorded with the stone count and the setting style. Seats are cut to the actual stone rather than to a nominal size, so the measurements on the record are the measurements of the stone in the piece.
The setting check covers seat depth and claw contact under magnification. Where a stone carries a GIA report, the report number is recorded against the job at this stage.
Stage five: finishing
Finishing covers polishing, rhodium plating where it is appropriate, milgrain and hand engraving. The record notes which of these were applied, because a finish is the hardest thing to describe in words and the easiest to disagree about later.
The piece is photographed at this stage, before it goes to assay, so the workshop photography shows it as finished rather than as handled.
Stage six: assay and hallmarking
Every finished piece goes to a UK assay office for testing and hallmarking, which adds 3-5 working days to a build. The hallmark record is attached to the project.
Hallmarking is a legal requirement above the exemption weight and it is carried out by the assay office rather than by the workshop. The record shows what was submitted and what came back.
Dispatch and handover
The last entry covers how the piece left the workshop: collection by appointment at 100 Hatton Garden, Suite 225, London EC1N 8NX, or insured, tracked courier with the consignment value declared.
The approved render, the certificates, the inspection notes and the hallmark record travel with the same project, so the record is complete at the point of handover.
What happens if a stage needs repeating?
It is recorded as a repeat rather than quietly overwritten. A casting that fails inspection is re-cast, a setting that is not secure is re-set, and the reason is noted against the stage. The history stays visible.
That is the difference between a record and a status update. A status can be changed to hide a problem; a dated sequence of stages cannot.
Who can see the record?
Access is arranged through your project contact. There is no client login and no app, so the record is shared rather than browsed: you are sent the render, the certificates, the photography and the stage updates as they happen.
Trade partners with an account have the specification and the batch records held on file against their orders.
At a glance
| Stages recorded | Brief and quote, CAD and render approval, casting, setting, finishing, assay and hallmarking, then dispatch. |
|---|---|
| What is attached to each | The document, certificate, inspection note or photograph that evidences that stage. |
| First CAD render | Within 24 hours of an agreed brief. |
| Standard build | 2-4 weeks from approved design. Express 4-6 days. |
| Assay | Carried out at a UK assay office, adding 3-5 working days. |
| How access works | Access is arranged through your project contact. |
Frequently Asked Questions
How many stages does Caesar Track record?
Six stages, with dispatch recorded as the handover after the sixth. They are the brief and the quote, CAD and render approval, casting, setting, finishing, and assay and hallmarking. Each stage carries its own evidence, and the record moves on only when that evidence is attached.
What is recorded at the CAD stage?
The CAD model, the renders made from it, and the version you approved. Renders arrive within 24 hours of an agreed brief and revisions continue until the design and proportions are right. The approved version is the one that goes to casting, so a repeat order is made from the model that was signed off.
Is the GIA report number kept with the job?
Yes. Where a diamond carries a GIA grading report, the report number is recorded against the job at the setting stage, so the piece, the certificate and the project record stay linked. Stones without an individual report, such as melee, are described by size range and grade instead.
Why is hallmarking a separate stage?
Because it is done by a UK assay office rather than in the workshop, and it adds 3-5 working days to a build. Keeping it as its own stage means the record shows when the piece left for assay, what was submitted and what came back, rather than hiding it inside finishing.
Can I follow the record without visiting?
Yes. Access is arranged through your project contact, and the remote process works across the UK: renders, certificates, production photography and stage updates are shared as the commission moves. Finished pieces are then dispatched by insured, tracked courier, so you never need to be in London.
Talk it through
Send a brief, a sketch or a photograph, or book an hour at 100 Hatton Garden, Suite 225, London EC1N 8NX. We will confirm what is possible, the timeline and a written quote before any work starts.
Contact the workshop